Hello everyone, this is India Biz Master.
Today, we're going to talk about an important topic: following environmental rules when starting a business in India.
This post is based on real experience with getting factory permits, so it has lots of helpful tips. If you read it carefully, you will learn:
The main environmental permits and steps needed to start a business in India.
The ongoing rules your company needs to follow to stay compliant.
Practical advice for making sure your company follows the rules.
Let’s get started!
Before Starting Your Company: Preparation Is Important!
Environmental Impact Assessment (EIA)
Required for big projects or industries that might affect the environment a lot.
Step-by-Step Process and Timeline
Pre-Feasibility Study (2-3 months)
Check the size and type of the project.
Figure out the potential environmental impacts.
Estimate the resources and budget needed.
EIA Report Preparation (3-4 months)
Assess environmental standards.
Identify impacts and create ways to reduce them.
Get expert reviews and make revisions.
Public Hearing (2-3 months)
Collect feedback from local people.
Discuss with stakeholders.
Develop responses to their concerns.
Review by Ministry of Environment and Forest (3-4 months)
Review documents and make changes.
Handle site inspections.
Get final approval.
→ Note! The whole process can take over a year, so plan it into your timeline.
Checklist for Choosing a Location
Land Use Certification Check
Make sure the land is allowed for industrial use.
Review past land use.
Check future development plans.
Approval from Local Government
Learn what local approvals are needed.
Prepare necessary documents.
Understand the process and timeline.
Environmental Sensitivity Analysis
Distance from protected areas.
Impact on water resources.
Distance from residential areas.
Consent to Establish (CTE)
Needed for all industrial projects. Prepare carefully.
Required Documents
Detailed project report.
Site layout plan.
Production process flowchart.
Pollution control plan.
During Company Setup: Things You Must Do
Consent to Operate (CTO)
Needed after construction is done but before starting operations.
Valid for 1-5 years depending on the industry.
Warning! Operating without CTO can lead to legal trouble.
Getting the Approval
Set up internal systems.
Prepare required documents.
Handle inspections by the State Pollution Control Board (SPCB).
Get approval.
Hazardous Waste Management Approval
Must be renewed every 5 years.
Create a waste management plan.
Appoint a manager.
Pollution Control Equipment Proof
Air pollution control equipment.
Wastewater treatment equipment.
Prepare for on-site inspections.
Running Your Business: Continuous Management Is Key
Annual Environmental Audit Report
This is a very important document that requires careful preparation.
Contents to Include in Report
Analysis of resource use.
Emissions information.
Waste management records.
Improvement plans for the environment.
→ External review by an independent auditor is required!
Regular Monitoring Reports
Air Pollution Management
Quarterly checks and reports.
Track key control measures.
Make improvement plans.
Water Pollution Management
Monthly water quality checks.
Assess treatment facility performance.
Address any issues found.
Approved Measurement Agencies
Use CPCB-approved labs.
Ensure data reliability.
Have regular lab evaluations.
Hazardous Waste Management Report
Must be submitted every year.
Management Details
Record how much waste was produced.
Explain disposal methods.
Show proof of third-party treatment.
Status of recycling.
Online Continuous Emission Monitoring System (OCEMS)
Required for 17 high-pollution sectors.
System Requirements
Real-time monitoring equipment.
Data transmission system.
Emergency response plan.
Important Reminders
Keep Up with Regulation Changes
Always check for new regulations.
Get help from experts.
Be ready for proactive actions.
Know Regional Differences
Learn rules specific to each state.
Keep in touch with SPCB.
Adapt to local conditions.
Work with Experts
Get help from environmental consultants.
Secure legal advisors.
Work with technical specialists.
Keep Good Records
Have a document management system.
Regularly back up data.
Make sure records are easy to trace.
Train Employees Regularly
Hold training sessions often.
Practice emergency response drills.
Clarify everyone's roles and responsibilities.
Communicate with the Local Community
Share environmental information openly.
Get feedback from local residents.
Link your activities with community support.
We've covered the basics of following environmental regulations for doing business in India. It may seem complicated at first, but if you follow each step carefully, it's totally manageable!
Remember, following environmental rules isn’t just about the law—it’s about investing in our future.
Healthy businesses grow in a healthy environment.
I hope your business in India grows and thrives while taking care of the environment.
Let's make it happen!
Bravo! Your Business!
#For more details..
https://blog.naver.com/won_consultancy
[인도 비즈니스를 위한 환경 규제 준수 가이드] 실무 A to Z: 허가와 규정
안녕하세요, 여러분. 인디아 비즈 마스터입니다.
오늘은 인도에서 사업을 시작할 때 꼭 지켜야 할 환경 규제에 대해 이야기해 보려고 합니다.
이 글은 실제 공장 인허가를 경험하면서 얻은 내용으로, 도움이 될 팁이 많이 있습니다. 꼼꼼히 읽으시면 다음과 같은 도움을 얻으실 수 있습니다:
인도에서 사업을 시작할 때 필요한 주요 환경 허가와 절차에 대한 이해.
회사 운영 중 지속적으로 관리해야 하는 환경 규제 준수 사항에 대한 인식.
환경 규제를 준수하기 위한 실질적인 조언.
시작해볼까요!
회사 설립 전: 준비가 중요합니다!
환경 영향 평가 (Environmental Impact Assessment, EIA)
환경에 큰 영향을 줄 수 있는 대규모 프로젝트나 산업에는 필수입니다.
단계별 절차와 소요 시간
사전 타당성 조사 (2-3개월)
프로젝트 규모와 유형 확인.
환경에 미칠 영향을 평가.
필요한 자원과 예산을 추정.
EIA 보고서 작성 (3-4개월)
환경 기준 평가.
영향 평가 및 저감 방안 마련.
전문가 검토 및 수정.
공청회 (2-3개월)
지역 주민의 의견을 수렴.
이해관계자와 논의.
대응 방안 마련.
환경산림부 심사 (3-4개월)
서류 검토 및 수정.
현장 실사 대응.
최종 승인 획득.
→ 주의! 전체 과정은 1년 이상 걸릴 수 있으니, 반드시 계획에 반영하세요.
입지 선정 체크리스트
토지 용도 증명서 확인
해당 토지가 산업 용도로 지정되어 있는지 확인하세요.
과거 토지 용도 변경 이력 검토.
향후 개발 계획 확인.
지방 정부의 사용 승인
관할 기관의 승인 필요 사항을 파악하세요.
필요한 서류 준비.
절차와 기간을 이해하세요.
환경 민감도 조사
보호 구역과의 거리.
수자원에 미치는 영향.
주거 지역과의 거리.
설립 동의서 (CTE)
모든 산업 프로젝트에 필수입니다. 꼼꼼히 준비하세요.
필요 서류
상세 프로젝트 보고서
부지 레이아웃 플랜
생산 공정도
오염 관리 계획
회사 설립 중: 꼭 해야 할 일들
운영 동의서 (CTO)
공사 완료 후 운영 시작 전에 필요합니다.
산업 유형에 따라 유효 기간은 1-5년입니다.
주의! CTO 없이 운영하면 법적 문제가 생길 수 있습니다.
취득 절차
내부 시스템 구축
필요한 서류 준비
SPCB 실사 대응
승인 획득
유해 폐기물 관리 승인
5년마다 갱신해야 합니다.
폐기물 관리 계획 수립
담당자 지정
오염 관리 장비 설치 증명
대기 오염 제어 장비
폐수 처리 장비
현장 실사 준비
회사 운영: 지속적인 관리가 중요합니다
연간 환경 감사 보고서
철저히 준비해야 하는 중요한 문서입니다.
보고서 포함 항목
자원 사용량 분석
오염물질 배출 현황
폐기물 관리 기록
환경 개선 계획
→ 외부 감사인의 독립적 검토가 필요합니다!
정기 모니터링 보고서
대기 오염 관리
분기별 점검 및 보고
주요 관리 조치 추적
개선 계획 수립
수질 오염 관리
월별 수질 검사
처리 시설 성능 평가
문제 발견 시 대응
측정 기관 요건
CPCB 승인 실험실 사용 필수
데이터 신뢰성 확보
정기 실험실 평가
유해 폐기물 관리 보고서
매년 제출해야 합니다.
관리 항목
발생 폐기물 기록
처리 방법 명시
외주 처리 증빙
재활용 현황
온라인 지속 배출 모니터링 시스템 (OCEMS)
17개 고오염 산업 분야에 필수입니다.
시스템 요건
실시간 측정 장비
데이터 전송 시스템
비상 대응 계획
중요한 기억 사항
규정 변경에 주의하세요
새로운 규정을 항상 확인하세요.
전문가의 도움을 받으세요.
선제적으로 준비하세요.
지역 차이를 이해하세요
주별 규정을 숙지하세요.
SPCB와 긴밀히 소통하세요.
지역 조건에 맞게 조정하세요.
전문가와 협력하세요
환경 컨설턴트의 도움을 받으세요.
법률 자문을 확보하세요.
기술 전문가와 협력하세요.
철저한 기록 관리
문서 관리 시스템을 구축하세요.
정기적으로 데이터 백업을 하세요.
기록이 추적 가능하도록 관리하세요.
직원 교육 강화
정기적인 교육을 실시하세요.
비상 대응 훈련을 하세요.
역할과 책임을 명확히 하세요.
지역 사회와 소통하세요
환경 정보를 공개하세요.
지역 주민의 의견을 수렴하세요.
활동을 사회공헌과 연계하세요.
인도에서 사업을 할 때 환경 규제를 준수하는 기본 사항을 살펴보았습니다. 처음에는 복잡해 보일 수 있지만, 하나씩 따라가면 충분히 해낼 수 있습니다!
기억하세요, 환경 규제를 준수하는 것은 법을 지키는 것만이 아니라, 우리의 미래에 대한 투자입니다.
건강한 환경에서 건강한 비즈니스가 자라납니다.
여러분의 인도 비즈니스가 환경과 함께 번창하길 바랍니다.
Bravo! Your Business!
#더 자세한 내용은..